Mulyawara No 1 was drilled by the Canadian Company, Rodinia Oil Corporation. This area
falls into the giant Officer Basin and the
well was spudded on the 9th June 2011 and plugged on the 13th October 2011 after long delays in drilling, reaching a total drill depth of 2691.3 metres.
For a full report of this venture, you can read more on this blog that I have also written.
http://www.exploroz.com/Members/58567.500/10/2013/The_Legacy_of_Mining_and_Oil_Exploration_Tracks_in_Australia.aspx